National Construction Intelligence Platform
Fair Work Award [MA000020] Calibrated

Paving & Landscaping Costs & Council Rules in Goulburn Valley Water

Complete statutory guide for paving & landscaping in Goulburn Valley Water, VIC. Fair Work CW3 benchmarks ($$70–$$190/$m²), council exemption thresholds, and local pricing intelligence.

Estimate Your Paving & Landscaping Project

Configured for Goulburn Valley Water standards · Regional pricing (1.15x)

Statutory Legal Analysis

Statutory Summary: In Victoria, paving & landscaping within At-ground landscaping preserving minimum 20% lot permeability are generally exempt from local council planning approval under Victoria Planning Provisions (Clause 62) & ResCode Permeability, provided standard boundary setbacks and site conditions are maintained.

Statutory Code

Victoria Planning Provisions (Clause 62) & ResCode Permeability

Approval Type

EXEMPT

Rule Summary

Hard landscaping and garden paving are exempt provided site permeability standards under ResCode (Standard A16/B28) are satisfied.

Exemption Threshold

At-ground landscaping preserving minimum 20% lot permeability

Setback Requirement

Standard boundary alignment permitted

Engineering Trigger

Works that drop permeable surface area below municipal scheme minimums

Local quote matching

Get Paving & Landscaping Quotes in Goulburn Valley Water

Send your project details and we will match your request with a paving & landscaping builder working in Goulburn Valley Water. Each request is reviewed by hand before it is passed on.

  • Free to submit
  • No obligation to proceed
  • Reviewed by hand

Council approval checklist

0 of 4 done

Steps to work through before you build in Goulburn Valley Water. Saved in this browser.

Frequently Asked Questions for Goulburn Valley Water

Planning rules, compliance exemptions and contractor cost benchmarks in Goulburn Valley Water, VIC.

Brick and concrete pavers average $75–$120/m² installed. High-end natural stone (travertine, granite or bluestone) ranges between $130 and $220/m² installed, including excavation, compacted roadbase, bedding sand, joint sand and perimeter haunching.

2026 Benchmark Pricing

Fair Work CW3 Rate

$70–$190

per square metre (inc GST)

Calibrated against Fair Work Building and Construction Award [MA000020] CW3 benchmarks.

Search Goulburn Valley Water DA Tracker